Home   |   Product knowledge

Product knowledge

Operating procedures for concrete mixer

Operating procedures for concrete mixer
1. Before mixing, the vehicle should be tested empty.

2. Adjust the timing of the time relay according to the mixing time, and pay attention to adjusting it under power-off conditions.

3. Moisturize the mixing drum, blades, and site with water.

4. If there is an electrical or mechanical failure during the process, part of the mixture should be unloaded to reduce the load, and the fault should be eliminated before starting the operation.

5. During operation and use, regular inspections should be conducted to prevent safety accidents such as electric shock and mechanical injury.

6. After the experiment is completed, turn off the power, clean the mixing drum and site, and tidy up.

Notes on Folding Editing in this Paragraph
1. The concrete mixer should be placed in a flat position, with square blocks used to support the front and rear axles, so that the tires can be placed on the ground to prevent movement during operation. 2. The concrete mixer should be equipped with secondary leakage protection. After the power is turned on before going to work, it must be carefully inspected. Only after passing the empty test run can it be used. During the trial operation, it is necessary to check whether the mixing drum speed is appropriate. Generally, the empty speed of the mixer is 2-3 revolutions faster than that of the mixer (after loading). If there is a significant difference, the ratio of the driving wheel to the transmission wheel should be adjusted.

3. The rotation direction of the mixing drum should conform to the direction indicated by the arrow. If it does not match the actual direction, the motor wiring should be corrected.

4. Check whether the transmission clutch and brake are flexible and reliable, whether the steel wire rope is damaged, whether the track pulley is in good condition, whether there are obstacles around, and the lubrication condition of each part.

5. After starting up, regularly pay attention to whether the various components of the concrete mixer are operating normally. When stopping, regularly check whether the blades of the concrete mixer are bent and whether the screws are loose or loose.

6. When the concrete mixing is completed or expected to stop for more than 1 hour, in addition to removing the remaining material, stones and clean water should be poured into the shaking drum, and the machine should be turned on to wash away the mortar stuck to the drum before discharging it completely. There should be no accumulated water inside the barrel to prevent rusting of the barrel and blades. At the same time, the accumulated dust outside the mixing drum should be cleaned to keep the machinery clean and intact.

7. After work and when not in use, the power should be turned off and the switch box should be locked to ensure safety.

fold

Contact Us

Contact: Lankecms

Phone: +86 13323820253

Tel: +86 15838065397

Add: NO.8,Li Kezhai,Xingyang,Zhengzhou City,China